![]() |
| The M7 Ballymany Interchange and a special horse access bridge at the Curragh Plains under construction. |
The scheme provided congestion relief for Newbridge town which was experiencing traffic flows of over 30,000 vehicles per day due to its location on the Dublin to Cork and Limerick routes. The scheme was also supported by the European Social Development Fund to enhance access to Ireland within Europe. The selection of a motorway cross section with a geometric design speed of 120 kilometre per hour for the scheme was an important design decision to ensure safe driving conditions on the bypass at a time of increasing car ownership levels in Ireland.
